A 1.5 mile paved extension was opened to the village of Leeds in 2009, at the North West end of the trail. An easement to extend the Mass Central Rail Trail (Norwottuck section) to South Main Street in Haydenville was acquired in January 2014. A 1/2 mile paved section was added in Leeds in 2015.